Explore detailed case studies of major drilling and engineering projects executed across international operations.

MPD on Solomon, Melmar, Horus Deep, Socorro
Executed HPHT deep water wells pioneering MPD; zero LTI and <8% NPT.

Dynamic well control: MPD/PMCD/MCD
Pioneered large bore gas wells with dynamic well control; NPT <8% and zero major audit findings.

Barossa Development Wells 5 & 6 optimization
Delivered performance optimization on Atwood Osprey for Barossa Wells 5 & 6 with strong safety culture (8-LSR).

Six-rig supervision; SPIRIT values and 8 LSR
Managed six-rig Bakken/Three Forks campaign with zero-harm culture and advanced safety systems.

300,000+ engineering man-hours
Delivered steam reforming units, sulfur plants, and engineering center establishment across Europe and North America.

Horizontal wells for major operators
Executed directional and horizontal wells across multiple basins with 100% success rate on planned trajectories.

STACK/SCOOP & multi-basin expertise
Comprehensive unconventional drilling operations across multiple states with focus on STACK and SCOOP formations.

Directional Excellence
Advanced directional drilling operations across major US basins with exceptional trajectory accuracy.

10 wells across Bligh Bank & Gardenia platforms
Offshore platform directional drilling delivering enhanced recovery with exemplary safety performance.

EST steam reforming, sulfur recovery, utility plants
Led large-scale engineering management (350,000+ hours) with teams of 55 engineers and rigorous interface coordination.

Advanced piping & layout engineering
Specialized design, verification, feasibility studies, 3D modeling, and comprehensive engineering documentation.

55,000 man-hours piping engineering
Led comprehensive piping engineering including material control, stress/support design, and RFQ/vendor management.

Engineering center launch & PDS 3D modeling
Launched engineering center operations, delivered PDS-Intergraph 3D modeling, technical training, and Pemex support.